Interpretation Response #PI-94-034


Below is the interpretation response detail and a list of regulations sections applicable to this response.

Interpretation Response Details

Response Publish Date: 10-24-1994
Company Name: Memo: Internal   
Country: US

View the Interpretation Document


Response text:

Memorandum

Date: October 24, 1994

Subject: INFORMATION: O&M manual regulations

From: Cesar De Leon, DPS-10

To: Richard Sanders, DTI-60

This responds to your memo of April 11, 1994, concerning the gas pipeline regulations in 49 CFR § 192.605.

Regarding § 192.605(a), you asked if it is the intent of this rule that all references to design and construction be omitted from O&M manuals. Operators must include in their manuals as much design and construction information, such as welding or other joining procedures, as is necessary to carry out operation, maintenance, and emergency response activities. For example, if a pipeline is to be repaired by replacing a segment of pipe, the operator's O&M manual would have to have design and construction information appropriate for that type of repair. Also, the O&M manual must contain procedures that enable operating and maintenance personnel to obtain as much original design and construction information as they need to carry out their assignments. However, such original information may be maintained apart from the manual.


Regulation Sections

Section Subject
§ 192.605 Procedural manual for operations, maintenance, and emergencies